Where Do Tolerance Values Come From — And Where Should They?
1.440 words, 8 minutes read time.
March 4, 2026


TECHNICAL NOTES #02
Tolerance disputes between design and manufacturing teams are among the oldest tensions in engineering. In this article, I explore what lies beneath that tension — how tolerance decisions take shape at the intersection of cost, process capability, and function. My goal isn’t to take sides, but to shift the conversation from “who’s right” to “what’s correct.” Because in my experience, the real problem isn’t the existence of tight tolerances — it’s that we rarely stop to ask why a particular tolerance is tight in the first place.
Throughout my career, I’ve sat on both sides of the tolerance table. On the design side, on the manufacturing side, and more recently as principal engineer and consultant playing the role of mediator. What I’ve consistently observed is this: the tension rarely comes from tight tolerances themselves. It comes from the feeling that there are too many of them — and that the number doesn’t feel fair.
In other words: not every feature on a part is equally critical. Yet when you look at drawings, you’ll frequently find parts toleranced as if they were. And that creates problems on both sides. The design team wonders why manufacturing is struggling so much, while manufacturing pushes back with “half of these tolerances are unnecessary.” Both are partially right. And that’s precisely the point where engineering dialogue gives way to a standoff.
Habit, Anxiety, or a Genuine Requirement?
Under time pressure, it’s not always possible to justify every single tolerance individually. Sometimes engineers don’t even realize that’s something they should be doing. The result: drawings where a handful of tolerances are genuinely critical, and the rest have been tightened out of habit or an abundance of caution.
There’s something I often tell junior design engineers:
“If an MRB comes knocking and you can’t technically justify a tolerance, don’t give it that tight in the first place.”
Simple in theory. Surprisingly hard in practice. Because every tolerance tightened on a “just in case” basis has a way of landing back on someone’s desk — either as an MRB form or as an inflated line item on a cost report.
There’s something else worth adding here: this isn’t just a problem for inexperienced engineers. Seasoned engineers operating without institutional memory — those who react on reflex with “we had a problem with this tolerance last time” — can fall into the same trap. A tolerance tightened as a fix for a past problem becomes an unjustified rule in the next design. And eventually, nobody remembers why that rule existed in the first place.
A Tolerance Isn’t Just a Number — It’s a Process Decision
There’s a graph I use frequently in my training sessions: tolerance range on the horizontal axis, relative cost on the vertical.

It’s a generalization, of course. The actual curve shifts depending on material, geometry, part size, and manufacturing process. But the core message hits hard every time: as tolerances tighten, costs don’t rise linearly — they multiply.
The reason is straightforward: every tolerance range has a corresponding manufacturing process. If an internal diameter requires high roundness and surface finish, you’re probably not talking about turning anymore — you’re talking about cylindrical grinding. And cylindrical grinding is less common, more expensive, and comes with its own capacity constraints. Tightening a tolerance by just a little can sometimes mean jumping to an entirely different process chain — and an entirely different cost structure.
But cost isn’t just about process selection. Tight tolerances also mean higher measurement costs. As tolerances shrink, the equipment and time required to verify them grows accordingly. When a feature that was once measured with a caliper starts requiring a CMM — or some other specialized measurement equipment — both inspection time and capital investment change significantly. In high-volume production, this cost element can reach dimensions that simply can’t be ignored.
Every Process Has a Comfort Zone
Every manufacturing process has a tolerance range it can hit reliably and repeatably. Push beyond that range and you’re looking at parts that constantly end up in MRB, high scrap rates, or a forced migration to more specialized and costly processes.
A typical process capability chart for cylindrical grinding shows three distinct zones:
Green zone: Where the process operates comfortably and repeatably
White zone: Where cheaper processes would actually be more appropriate — this process is overkill
Red zone: Where the process simply can’t deliver consistent results — and where scrap and MRB costs spiral out of control

A Tolerance Decision Is Not a Desk Exercise
There’s a scenario I encounter frequently in tolerance discussions: the design team completes the drawing, manufacturing raises objections during production, and the argument begins. At that point, both sides have valid reasons for their positions — but the problem started much earlier.
Tolerance decisions are not something to be handed off to manufacturing once the drawing is done. They are an engineering discipline that needs to be embedded into the design process, as early as possible. This is exactly why “Design for Manufacturability” exists as a concept. But for it to mean anything in practice, design and manufacturing teams need to be at the same table before the design has fully matured.
What this early dialogue looks like varies from company to company. In some organizations, it means manufacturing engineers participating in design reviews. In others, DFM analysis is defined as a distinct process step. Whatever approach is adopted, the key point remains the same: when a tolerance decision is being made, its implications on the production floor need to be part of that conversation.
Determining Criticality: From Intuition to System
So how do you actually know whether a tolerance is genuinely critical? More often than not, that question gets left to engineering intuition. But intuition, particularly in complex systems and high-volume production environments, isn’t enough.
One of the most powerful tools for addressing this is DFMEA. Design Failure Mode and Effects Analysis allows you to systematically evaluate the impact of each feature on function. Determining how critical a tolerance really is comes down to three questions:
What happens when this feature goes out of tolerance?
How frequently could that deviation occur?
The answers to the questions clarify whether a tolerance is a genuine critical characteristic or simply a standard feature. Critical characteristics require both special process controls and more rigorous inspection plans. Standard features can be handled within routine quality control.
A control plan developed without making this distinction is one of the most reliable ways to misallocate resources. Treating everything as equally critical is, in practice, equivalent to treating nothing as truly critical.
Keeping All Three Corners in View
Regardless of who holds the pen, three things need to be considered simultaneously in every tolerance decision:
Function — Manufacturing Reality — Cost
Ignore any one of them, and you end up with one of three outcomes:
Produced but non-functional → scrap
Perfect on paper but unproducible — or produced at constant MRB/scrap cost → fantasy
Functional and producible but requiring unnecessarily expensive processes → uncompetitive
The target is a product that delivers the required function, toleranced in a way that aligns with the most widely available and cost-effective processes. A tolerance decision that keeps all three corners in view pays dividends on the production floor and on the cost sheet alike.
Instead of a Conclusion: The Right Question
I’m not saying avoid tight tolerances. For features that are genuinely critical, tight tolerances are not just justified — they’re non-negotiable.
But here’s the question worth asking: Of all the tolerances on a given drawing, how many are truly critical? How many were tightened out of anxiety? How many out of habit?
Answering that question systematically makes life easier for both design and manufacturing teams, drives costs down, and shifts the tone of these conversations from confrontation to engineering dialogue. Which, if we’re honest, is what both sides actually want.
In upcoming articles, we’ll dig into the systematic tools for identifying what’s truly critical — DFMEA, critical characteristics, and measurement costs — with case examples.