The part that arrives on the measurement table is never as perfect as it looks on the CAD screen. So how do we deal with that reality?
Models coming out of CAD are ideal, nominal, and perfect. Manufactured parts, on the other hand, contain variations and deviations — to some degree — across all of their geometric features. To compare this imperfect manufactured part with the perfect nominal one, within the bounds of tolerances of course, we need to establish a bridge. That bridge is the datum.
But how do we build it? According to ASME Y14.5-2018, datums are theoretically perfect points, axes, or planes. How do we derive them from a manufactured part whose surfaces are anything but perfect?
Roadmap
In this new article of the series, we’ll follow three main steps using a sample part:
- We’ll examine how datums and datum reference frames — that is, coordinate systems — are established.
- We’ll look at how tolerance zones are positioned relative to that coordinate system.
- We’ll walk through a multi-step analysis of how the variations in actual/real manufactured geometric features can be evaluated against those zones.
The part we’ll be working with is the MCH04222026-Flange Part, which also appears in Mechapoint’s training content. You can download the 3D PDF technical drawing of this part, prepared using the MBD (Model-Based Definition) method, from the link below:
https://mechapoint.engineering/case-studies-and-samples/
If you’d prefer not to download anything, you can access the interactive 3D MBD model and its annotations directly here:
https://mechapoint.engineering/3d-viewer/3D_PDF_MBD_Drawing_MCH04222026_Mechapoint.html
Manufactured Actual Part
Let’s start by visualizing what we mean by “nominal geometry vs. as-manufactured geometry.” The MBD technical drawing you’re looking at was prepared using the nominal CAD model, as expected — and all annotations were defined on that model as well. But what would the actual manufactured version of this part look like?

As you can see, we’re looking at a part with surfaces that aren’t perfectly flat, diameters that aren’t perfectly round — wavy and full of variation. And that gap between the nominal and the manufactured part is exactly what this is all about.

Let’s take this part — the only real, physical thing we can actually hold in our hands — and work from there. There are many geometric controls defined on this part, but for now let’s focus on the position tolerance applied to the group of eight holes. As you’ll notice, the position control is referenced to the A-B datum set — the A-B DRF. So we first need to establish datum -A-, then datum -B- referenced to it, and from there construct a DRF — a coordinate system.

Datum Systems and Coordinate System Setup
Let’s keep this in mind: working from the real part, we’re trying to establish — in measurement terms, a coordinate system; in ASME Y14.5 terms, a “Datum Reference Frame” (DRF); and in ISO GPS terms, a “Datum System.” Whatever you call it, it’s a coordinate system. We typically use a Cartesian coordinate system, where the axes and the planes between them are perfectly perpendicular to one another.
Our goal is to derive a perfect coordinate system from these imperfect surfaces. Once we have that, we can define ideal tolerance zones within it — and then evaluate where the actual/real geometric variations fall relative to those zones.

The actual/real surface we’re working with is rough, uneven, and wavy. You might ask: does this “actual” surface always come to us as a complete surface, with every point accounted for? It depends — on the measurement method, equipment, and strategy you’re using. (Assuming we’re not using a functional gage for datum simulation.) With a CMM, you’ll capture a limited number of points or lines; with a 3D optical scanning device, you can cover larger surface areas, though likely at lower resolution. ASME standards don’t have a specific term for this, but ISO GPS calls it an “extracted feature.” For now, to stay focused on the main thread, we’ll proceed on the assumption that we have the full actual surface available.
Datum A: From a Wavy Surface to a Perfect Plane
We need to derive a perfect plane from the rough, uneven “datum feature A” surface. To go from an imperfect surface to a perfect datum, we need an intermediary — ASME Y14.5 calls this a “True Geometric Counterpart (TGC)“; ISO GPS calls it an “Associated Datum Feature.” To fit a perfect plane to this actual/real surface, different fitting methods can be used: “tangent plane,” “least squares,” and “Chebyshev/minimax,” among others. Without getting into the details of each, let’s use the “external tangent plane” method — the ASME Y14.5 default for planar datums.
We now have a perfect plane derived from the actual/real datum feature A surface. That plane is datum A itself.

We have datum A — but a single plane isn’t enough to evaluate the geometric controls we’re targeting. We need a full coordinate system corresponding to the A-B datum set. Let’s now bring datum B into the picture.
Datum B: From a Cylindrical Surface to a Perfect Axis

We again have a wavy, imperfect surface in front of us: datum feature B. Let’s ask the more fundamental question: what exactly are we trying to derive from this imperfect surface?
It’s an axis. A perfect axis can be derived as a datum from a cylindrical datum feature. But not just any axis — it needs to be perfect and perpendicular to datum A, because we’re after the B in the A-B datum set.
Just as we did with datum -A-, we’ll use an intermediary: a perfect geometric counterpart fitted to this imperfect surface — a “True Geometric Counterpart.” This time, since our datum feature is an external cylindrical surface — a feature of size — our True Geometric Counterpart needs to be not a plane, but an “AME (Actual Mating Envelope).” This AME will be a perfect cylinder created using the “Minimum Circumscribed Cylinder” method. That cylinder must satisfy the following:
- It must be perpendicular to datum -A- — (because the reference hierarchy must be maintained)
- It must envelope the actual/real surface from the outside without violating any surface element — (the external contact requirement)
- It must be the smallest cylinder that satisfies these conditions — (as required by the minimum circumscribed definition)
Once this perfect cylinder is established and positioned, its axis becomes datum B — or more precisely, the datum B of the A-B datum set.

Datum Reference Frame: The Coordinate System Is Ready
We now have a plane and an axis perpendicular to it. The goal is to build a Cartesian coordinate system using only the A-B datum set. In this example, there’s no tertiary datum (such as datum-C). In this case, following ASME Y14.5’s guidance, we can add two more mutually perpendicular planes — with their intersection axis passing exactly through the B datum axis — giving us a total of three mutually perpendicular planes. We now have a “Datum Reference Frame” — also known as a Datum System — in other words, a coordinate system.


Hole Locations and AMEs: Placing the Tolerance Zones
With our reference frame established, let’s place the position tolerance zones where they belong. The tolerance cylinders, each with a diameter of 0.4 mm, will be positioned according to the bolt circle they lie on and the nominal angular and linear spacing between them. These values can be read directly from the MBD model; if a conventional 2D drawing is used, they’ll appear as basic dimensions on the drawing.

Now let’s look at the actual/real holes. How do we find the actual/real axes of these imperfect hole surfaces? Again, through AMEs — or “associated features” in ISO terminology. But this time it should be “Unrelated” AME. For each hole, we’ll construct a perfect cylinder with the following property:
It will be the largest cylinder that fits inside the actual hole surface without violating any surface element — (as required by the Maximum Inscribed Cylinder definition)
We’ll apply this process independently to each hole.

Inspection Step: Are the Axes Inside the Tolerance Zones?
Some AME cylinder diameters will be slightly larger, some slightly smaller — whatever it takes to fit inside the respective hole without surface violations. Once these perfect cylinders are established, each one’s axis becomes the actual/real axis of that hole.
We have the actual axes; we already positioned the position tolerance zones earlier. Now let’s check whether these axes fall within their respective tolerance zones. In the visuals, you can see the actual axes — shown in red, derived from each hole’s red (Unrelated) AME — within the yellow tolerance zones. You can also refer to the combined view showing the actual part, the established DRF, the position tolerance zones, the hole AMEs, and the actual axes all together.


From Theory to Practice: The Foundation of the Right Decision
In this article, we used a model simulating an actual/real manufactured part to walk through GD&T theory in a more visual and detailed way — but it’s still the theory. For example, we show cylindrical tolerance zones for position; in practice, a CMM doesn’t physically construct those cylinders. Instead, it probes a limited number of points across multiple cross-sections of each hole, computes the center coordinates of the resulting circles, and compares them against the ideal coordinates. Similarly, datum A — shown here as an ideal plane — is in the real world either derived from a limited set of CMM points or simulated by seating the part against a gage surface.
How we actually measure and simulate things in the real world depends on many factors: available equipment, capabilities, required accuracy, production volume, and the maturity of the manufacturing processes, among others.
Conditions on the shop floor are never static — but making the right calls starts with truly understanding where the theory leads. That’s what this article set out to establish.
To stay focused on the main thread, several related topics were either not covered or only briefly touched on in this article. Related vs. Unrelated AMEs, the effect of datum precedence on DRF construction, datum simulators, candidate datums, and measurement reporting are among them. We’ll cover these — and take a similarly visual and in-depth look at the other geometric controls on this part — in upcoming articles.
For original GD&T training content covering parts like this one, feel free to explore Mechapoint’s training pages:
https://mechapoint.engineering/gdt-training-courses/